neu

alt

Pipecleaning

Pipe cleaning equipment is pushed or pulled through the pipe.
The settlement will be removed that way.

The performance of drilling is a mechanical pipecleaning, where a drillhead, which is powered by a rod, is able to remove very hard settlement out of the pipe. This, up to 150 m extendable drilling rod, is set in motion by a drilling-supply-car.

Our service

ikon MOLCH-Pipecleaning

ikon Industrial-Pipecleaning

ikon Disposal from blockage

ikon HD-Pipecleaning

ikon Procedure of drilling on

ikon 23 hour emergency

 

..